(574) 533-0663

Troyer Foods

About this project

This was a multilevel project that consisted of a total of 70,908 sqft. The largest of all of the areas was the Freezer, which was a complete tear-off. In all other areas, we removed the membrane and replaced it with new Duro-Last, finishing off the edges with metal Fascia.